Here are some case studies

 

  • FELTON STREET, COLVILLE ESTATE HACKNEY, LONDON

    The proposed development was the construction of a high-rise residential building of eight-storey in height. The high loads including tension forces meant that piles were required. Due to the presence…

    Tuesday January 31

  • WESTFIELD LONDON, ARIEL WAY & RESTAURANT AREA, SHEPHERDS BUSH, WHITE…

    The proposed development will comprise an extension to the existing Westfield Shopping Centre comprising multi-storey retail and multi-storey car parks. Given the high loads including horizontal and tension forces meant…

    Tuesday January 31

  • HARBOUR CENTRAL, ISLE OF DOGS, LONDON

    Harbour Central development includes several high-rise buildings with up to 41 floors over a 6m deep basement. Piling works included both an embedded retaining wall and piled foundations. Given the…

    Monday January 23

  • SPRING MEWS BUILDING D, LONDON

    The Client required the design and construction of 39 bearing piles to support a multi-story student accommodation/hotel building located at Spring Mews, London. 35 piles were to be constructed inside…

    Wednesday January 11

  • 1 PHIPP STREET, LONDON

    The Client required the design and construction of 118 bearing piles to support a five-story mixed use commercial building (with basement) located at 1 Phipp Street, Shoreditch, London. The piles…

    Wednesday January 11

  • CROSSRAIL C360; STEPNEY GREEN SHAFT PILING WORKS

    Crossrail required large diameter bearing piles in restricted access adjacent to the Stepney Green Shaft which provides ventilation to the underlying tunnel approximately 30m below ground level. The piles were…

    Friday January 06

  • CYGNET STREET DEVELOPMENT, HACKNEY, LONDON

    The client required an 8.7m deep basement to be constructed as part of the works at Cygnet Street. To enable this it was considered that, due to the high ground…

    Tuesday August 04

  • 22 STATION ROAD – OFFICE BLOCK DEVELOPMENT, CAMBRIDGE

    The construction of a multi-million pound office development by Wates Construction in Cambridge Brookgate’s 22 Station Road scheme, a £33m five-storey development of 64,770 sq ft office space. Upon completion,…

    Tuesday August 04

  • EPSOM DOWNS RACECOURSE

    As part of the redevelopment of Epsom Downs Racecourse a new grandstand is to be constructed. This is to be done in two phases with the lower tier open for…

    Saturday July 25

  • 306-308 BARKING ROAD, NEWHAM, LONDON

    The client required a basement to be constructed as part of the works at Barking Road. To enable this it was considered that, due to the high ground water table,…

    Saturday July 25

  • 3 PARK PLACE VILLAS, HOLLAND PARK, LONDON

    The challenge of this project was to form a double basement underneath and to the rear of this listed building in order that a swimming pool and gym area could…

    Saturday July 25

  • ADULT MENTAL HEALTH UNIT, ST. MARY’S ROAD, SOUTHAMPTON

    The AMHU is an extension to the existing Royal South Hants Hospital in Southampton. The topography of the site was such that to enable construction of the lower ground floor…

    Saturday July 25

  • CAXTON STREET, ROYAL GATEWAY DEVELOPMENT, CANNING TOWN, LONDON

    As part of the redevelopment of Galliard Homes a new residential Development is to be developed. Royal Gateway will comprise five 14 storey apartment blocks offering a choice selection of…

    Saturday July 25

  • FRECKLETON STREET, MONTAGUE STREET LINK NEW BRIDGE WORKS, BLACKBURN

    Piles were required for abutments for a new bridge across the river Blakewater in the northwest of England. The high loads including horizontal forces meant that piles were required. The…

    Saturday July 25

  • NEW METROBANK, AYLESBURY, BUCKINGHAMSHIRE

    The challenge of this project was to form greater/larger space within a confined space in a listed building to provide banking financial services. Access for all equipment was restricted to…

    Saturday July 25