Construction Techniques Ancillary services Guidance Health and Safety People Contact Us  
  "We believe in building long term relationships with our customers"

 

   
     

Driven Piling

 
  Drivenpiling  

Construction Technique & Application

Driven piles are installed by dropping a hammer weight on a pre-formed pile. When the pile moves a predetermined distance for a given hammer drop height the pile capacity has been achieved.

Central Piling offer a bottom driven steel cased system with additional sections of casing being welded on as required. Reinforcement and concrete is then placed in the casing to provide a connection to the overlying structure.

Driven piling is particularly appropriate where soft and alluvial soils overlay dense sands and gravels.

Plant & Equipment

To carry out driven piling we utilise 25T crane mounted rotary rigs and where access is restricted a 2.5T mini rig. If necessary machines can be supplied to pre bore through the upper material.

 

 

 

 
Home  :   Construction Techniques  :  Ancillary Services  :  Equipment  : Health and Safety  : Contact us 
  © 2008 Central Piling. All right reserved Website designed by DINC